Turn Key Plants

PltsLlaveenMano1.jpg

 

Turn Key Plant Projects include the following phases:

  • Engineering
  • Procurement
  • Fabrication
  • Construction
  • Precommissioning / Commissioning
  • Start up

 

EPC projects offer all the guarantees normally required by the market and they are supported by 30 years of experience.

Projects are developed following the PMI guidelines (see PMS).

The plants designed and constructed by Tecna are:

  • Gas Treatment Plants
  • Gas Dehydration Plants
  • Gas Sweeting Plants
  • Gasoline Fractionation Plants
  • NGL Fractionation Plants
  • LPG Recovery Plants
  • NGL Recovery Plants
  • Contaminant Removal Plants
  • Gas Compression Plants
  • Fired Heaters
  • Water Treatment Plants
  • Topping and Diesel Production Plants
  • Refining 
  • Offshore

  

Pre-Commissioning, Commissioning and Start-up

With special emphasis on the Plants designed by TECNA, but applicable to any industrial facilities, systems enabling the conduct of construction final activities and start-up, in a safe and controlled manner, have been developed.

Pre-commissioning is the facility's check and verification activities that ensures that what has been built is in accordance with the approved engineering. We work on the Systems in which a Plant is divided in a de-energized condition.

What follows is Commissioning, which includes verification and tests with the systems in an energized condition, both from an electric and fluid pressure point of view leading the plant to a Ready-For-Start-Up condition.

The Start-Up is the culmination of a project, where all design, safety and operation aspects must converge for the purpose of achieving the initial start, the adjustment of operation parameters and the Plant final test run.

 